More reno pictures below. You can see the crew has gotten to framing around the duct work and i-beams and any bulkheads that are sticking out. It looks like a lot of work. The basement is starting to come together. Enjoy the pictures below.

Descriptions in order are: Picture 1: framing around the support post in the bedroom. Pictures 2-4: framing about the i-beam and ducts in the bedroom. Picture 5: the door thresholds for all the rooms are now cut out so the doors can be installed (pic of the bedroom entrance). Picture 6 & 9: framing around the pipe going upstairs next to the storage room. Picture 7: the framing is complete for the storage under the stairs and if you look closely you can see the where the light fixtures is going to go. Picture 8: framing around the duct work in the hallway outside the bathroom. Picture 10-14: framing is all complete on all the inside and outside walls from ceiling to floor. Picture 15: the light switch is finally in for the top of the stairs (still doesn’t work though).

Advertisements

Entry filed under: Basement Reno, Our House.

Day 9 & 10 of the reno Day 12 & 13 of the reno

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

Trackback this post  |  Subscribe to the comments via RSS Feed


My Twitter

Recent Posts

Blog Visits

  • 31,024 hits

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

Join 1,059 other followers


%d bloggers like this: